Project Name Design, Procurement , excavation, extension and testing for control cables for transferring signals for Hawija water tanks & the treatment plants (19650 M.L) Kirkuk
Description of the project Design, Procurement excavation, extension and testing for control cables
Client Ministry of Municipality & Public works
Date 18.09.2009

 

Project Name Design & construction of Babylon University buildings.
Description of the project Design, supply all materials and construction buildings for Babylon university of different size.
Client Ministry  of Higher Education and scientific research
Date 12.08.2009

 

Project Name Design, Procurement and extension for Control cables for Najaf Refinery (10800 M.L) for state company for oil projects.
Description of the project Design, Procurement and extension for Control cables for Najaf Refinery (10800 M.L)
Client Oil Ministry
Date 22.05.2009

 

Project Name Design , Procurement and extension for telecommunication Cable for Oil Ministy for Terminal Project of 22 KM .
Description of the project Design , Procurement and extension for telecommunication Cable
Client Oil Ministry
Date 16.4.2008

 

Project Name Supply control system
Description of the project Supply, install and operate electrical control equipments for gas project.
Client North Gas Company/Oil Ministry
Date 30.06.2002

 

Project Name Supply of 12" x 60km ERW pipes
Description of the project Supply of steel pipe (12" x 60km) for Anbar project, welding and laying of the pipes
Client State Oil Projects Company
Date 15.05.2002

 

Project Name Construction of embankments and culverts to project Al-Qaim town from rains
Description of the project Construction of embankments and culverts to project Al-Qaim town from rains
Client State Commission for maintenance of irrigation projects
Date 29.04.2002

 

Project Name Supply, welding and extension of steel pipe
Description of the project Supply, welding and extension of steel pipe for power 10" x 60 km
Client State Oil Projects Company
Date 28.04.2002

 

Project Name Supply of 3 pipe layers
Description of the project Supply of side boom (Pipe layer)
Client State Oil Projects Company
Date 27.03.2002

 

Project Name Supply of 5 Backhoe
Description of the project Supply of 5 Backhoe
Client Interior Ministry
Date 26.02.2002

 

Project Name Al-Thlueiya Irrigation Project
Description of the project Design and construct concrete irrigation channel and irrigation structures including serviced roads of 18 KM length.
Client Irrigation Ministry
Date 01.02.2002

 

Project Name Construction of foundation for fuel storage tanks / strategic project for (Al-Faw town)
Description of the project Construction of foundation fuel storage tanks strategic project (Al-Faw town)
Client Oil Ministry
Date 23.08.2001

 

Project Name Construction of Umara' Al-Azear road
Description of the project Construction of Umara' Al-Azear road 66 KM
Client State organization for roads and bridges
Date 13.02.2001

 

Project Name Construction of parking squares roads
Description of the project Construction of parking squares on Baghdad Samars road
Client State organization for roads and bridges
Date 01.02.2001

 

Project Name Construction of roads & bridges for Al-Meshrak roads
Description of the project Construction of roads & bridges for Al-Meshrak roads
Client Ninava Governorate
Date 21.01.2001

 

Project Name Construction of roads & bridges for Al-Meshrak roads
Description of the project Construction of roads & bridges for Al-Meshrak roads
Client Ninava Governorate
Date 21.01.2001

 

Project Name General Corporation for water & sewage (GCWS)
Description of the project Design and construction of irrigation concrete channels, concrete regular box culvert and car bridge
Client Salah Al-Deen Governorate
Date 13.01.2001

 

Project Name Construction of Nathim  Al-Kasara embankment  - Missan road
Description of the project Construction of Nathim  Al-Kasara embankment  - Missan road
Client State organization for roads and bridges
Date 11.01.2001

 

Project Name Construction of military stores of 24 m width and 60m length.
Description of the project Construction of military 10 stores of 24 m width and 60m length.
Client Salah Al-Deen Governorate
Date 17.07.2000

 

Project Name Embankment Contract
Description of the project Construction of embankments and culverts between Al-Hadama
Client Irrigation Ministry
Date 13.03.2000

Projects on water sector Implemented by QEG

 1) Supplying and implementing the mechanical, electrical and civil works of Abu-Ghraib Water Treatment Project / Baghdad.

     Client: Ministry of Municipals and Public Works/Iraq.

 Capacity of the project:  22000m3/day, including the construction of a suspended water tank of 25 m height and 1136 m3 capacity.

untitled.JPG

         Work details: The work was completed in 08/08/2002, and it included the preparation of the mechanical, electrical and civil designs, importing of all necessary equipments, implementing the civil works, assembling, installing, operation and maintenance of the project for one year. The details of these works include:

  Supplying of 6 km long and 600 mm diameter water pipelines.

  Construction of two settling tanks of 26 m diameter each with Flash Fixers.

  Building of a ground concrete tank of 2000 m3 capacity.

  Construction of power plant building and filters building to accommodate (10) filters of 20 m2 area each.

  Construction of a building for chemicals.

  Building high pressure and low pressure pumping stations.

EST 3

 

  Building a mud pool.

  Construction of Management Building, (2) houses for operators, and (1) house for the engineer.

  Implementing, assembling, installing and operation of the project.

  Maintenance of the project for one year.

2) Supplying the mechanical & electrical equipments and implementing the civil works of Al-Hawija Water Treatment Project / Kirkuk.

        Client: Ministry of Municipals and Public Works.

        Capacity of the project:  44000 m3/day.

         Work details: The work includes the preparation of the mechanical, electrical and civil designs, importing of all necessary equipments, implementing the civil works, assembling, installing, operation and maintenance of the project. The details of these works include:

Construction of (3) settling tanks of 34 m diameter each with Flash Fixer and receiving well.

Building low pressure and high pressure pumping stations.

Construction of filters building to accommodate (10) filters of 40 m2 area each.

  Construction of a power plant building.
  Building of a ground concrete tank of 4000 m3 capacity.
  Construction of a building for chemicals.

  • Construction of two 25m height suspended water tanks of 2272 m3, 1136 m3 capacities and.
  • Construction of water pipelines of 500 mm, 600 mm diameters and 3500 m, 5500 m lengths respectively.
  • The work also includes the installing of the mechanical, electrical and control equipments as well as operating and maintaining the project for one year.

G ALL 1

3) Supplying and installing of accumulated water units.

        Client: Ministry of interiors

        Capacity: 4 units of 250 m3 each.

        Work details: This project was implemented in 2000, and the work included the followings:

  Supplying, assembling and installing the accumulated units.

  Construction of the concrete bases and connecting the accumulated units.

    Construction of supplying well for the project.

  Connecting the accumulated units with the national electricity grid.

  Supplying and installing a stand by electricity generator.

  Operating and maintaining the project for 6 months.

4) Supplying the mechanical and electrical equipments (Turnkey Project) of Al-Muftiya Water Treatment Project / Basra.(under construction)

        Client: State Company for Oil Projects (SCOP) Ministry of Oil.

        Capacity: 2000 m3/hr. (two units of 1000 m3/hr).

        Work details: The work included the preparation of the mechanical, electrical and civil designs of the project (Turnkey Project). The work details are as following:

  • Construction of (4) settling tanks of 27 m diameter each with Flash Fixer and receiving well.
  • Construction of two 5000 m3 Steel water Storage tanks.

 

  • Construction of horizontal cylindrical pressure vessel filters (10×2) of 13.42 m2 area each.
  • Construction of buildings for power plant, chemicals and maintenance workshop.
  • Construction of services buildings.
  • Construction of water pipelines of 600 mm, 500 mm diameters.
  • Supplying, assembling and installing the equipments.